AZEK C044-001 Instalační příručka Strana 3

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 8
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 2
Page 3
Installing AZEK Resurfacing Transition Pavers
4X8 PAVERS IN
DESIRED PATTERN
SUB-STRUCTURE
TRANSITION PAVER
SCREW TABS
APPLY ADHESIVE
GRID
TRANSITION PAVER TO BE FULLY
SUPPORTED BY SUB-STRUCTURE
TRANSITION PAVER
SUB-STRUCTURE
GRID
45°
SUB-STRUCTURE
TRANSITION PAVER
4X8 PAVERS IN
DESIRED PATTERN
SCREW TAB
APPLY ADHESIVE
GRID
CUT TRANSITION
PAVER 1 AS SHOWN
CUT TRANSITION PAVER 2 AS SHOWN
TRANSITION PAVER TO BE FULLY
SUPPORTED BY SUB-STRUCTURE
TRANSITION PAVER
SUB-STRUCTURE
GRID
Resurfacing Transition Pavers
Choose a starting point based on the dimensions of the project and the desired pattern.
• Trim expansion nubs off front edge of grid.
Apply 1/4" bead of adhesive to the top ribs of the Grid.
(Titebond PROvantage Landscape Adhesive is recommended).
Place Transition Paver onto the Grid, pressing rmly.
Screw down the visible tabs into the Grid using 1" Screws.
Do not screw into subsurface.
Slide adjacent Transition Pavers into place until nished.
May need to cut off exterior tabs)
Let cure for a minimum of 72 hours.
Corner Assembly
Zobrazit stránku 2
1 2 3 4 5 6 7 8

Komentáře k této Příručce